Contribution Margin per Unit and Total Calculator
Calculate unit contribution using the variable costs relevant to output.
Allocate manufacturing overhead using the budgeted base and the activity actually entered. Keep direct materials, direct labour and selling costs out of the indirect manufacturing pool.
Allocate a manufacturing overhead pool using one chosen activity base. The tool totals indirect production costs, calculates a rate per base unit and applies that rate to the activity supplied.
Add the listed indirect production expenses. A meaningful allocation requires costs related to the activities or products being charged, rather than an arbitrary collection of business expenses.
Divide the entered pool by positive budgeted base quantity. The result is an amount per hour, unit or other consistently chosen activity measure.
Multiply the rate by actual activity. Subtract applied overhead from the entered pool to show an unapplied amount, or excess allocation if negative.
Sample inputs demonstrate the method. They are not a forecast or product offer.
The costs total €6,000. Dividing by 2,000 budgeted machine hours gives €3 per hour. Applied to 1,800 actual hours, this allocates €5,400 and leaves €600 of the entered pool unapplied.
Sample inputs demonstrate the method. They are not a forecast or product offer.
The final difference compares applied overhead with the pool supplied here. When that pool represents budgeted costs, the difference is a budget allocation comparison.
Do not automatically label it actual under- or over-applied overhead. That conclusion requires actual incurred cost and a consistent predetermined-rate basis, which this single-pool form does not collect separately.
Not in one rate. Choose a consistent allocation base or run separate pools for the different production activities.